The boat showed widespread deterioration of the exposed surfaces, with thinning planks and localised failure of the seams. After surveying the existing condition, the deck was dismantled under controlled conditions, the substrate was inspected and the surfaces rebuilt. The work included overhauling the drainage systems and replacing the margin boards.


